Nov 9, 2023
Romania - M1A2 Abrams Main Battle Tanks
- The Government of Romania has requested to buy fifty-four (54) M1A2 SEPv3 Abrams Main Battle Tanks; fifty-four (54) M1A1 Structures; four (4) M88A2 HERCULES Combat Recovery Vehicles; four (4) M1110 Joint Assault Bridges; four (4) M1150 Assault Breacher Vehicles; four (4) Heavy Assault Scissor Bridges (HASB); fifty-four (54) M240C 7.62mm machine guns; ten (10) AGT1500 Gas Turbine engines; five thousand nine hundred forty (5,940) 120mm M1147 High Explosive, Multipurpose, Tracer (HEMP-T) cartridges; and four thousand two hundred thirty (4,230) 120mm M1002 Target Practice Multipurpose, Tracer (TPMP-T) cartridges. Also included are mine rollers; Enhanced Heavy Equipment Transporter (EHET) M1300 tractors with M1302 trailer with B-Kit/Frag Kit; Heavy Expanded Mobility Tactical Truck (HEMTT) M978A4 with B-Kit/Frag Kit; Tank Rack Modules (TRM) M107A1 fuel trailer (2500 gal) with B-Kit/Frag Kit; HEMTT A4 M1120 Load Handling System (LHS ) with B-Kit/Frag Kit; Ml076Al with flat rack and B-Kit/Frag Kit; Forward Repair Systems; trailer mounted generators; Common Remote Operated Weapons Station Low Profile (CROWS-LP); M2A1 .50 caliber machine guns; communications equipment; global positioning system (GPS) receivers; service and training ammunition; spare and repair parts; Special Tools and Test Equipment (STTE); technical manuals and publications; maintenance trainers; gunnery training systems; tank driver’s trainers; new equipment training; U.S. Government and contractor technical, engineering, and logistics personnel services; concurrent spare parts; Field Service Representative (FSR) support; Contractor Logistics Support (CLS); Next Generation Automatic Test System (NGATS); logistics products; tank range upgrade; Intensive Management Office (IMO); Foreign Liaison Officer (FLO); Program Management Reviews (PMR); test measurement and diagnostic equipment; and other related elements of logistics and program support. The estimated total program cost is $2.53 billion.
Military Identification Friend or Foe Market Report 2023-2033
Forecasts by Type (Standalone Systems, Integrated Systems), by Platform (Terrestrial, Airborne, Naval), by Mode (Mode-1, Mode-2, Mode-C, Mode-3/A), by Technology (IFF Transponder, IFF Interrogator, Crypto Computer, IFF Antenna, IFF Test Equipment), by Deployment (Ground Based, Vehicle Mounted, Aircraft, Unmanned Aerial Vehicle, Ships and Carriers, Submarines) AND Regional and Leading National Market Analysis PLUS Analysis of Leading Companies AND COVID-19 Impact and Recovery Pattern Analysis
Download free sample pagesThe proposed sale will improve Romania’s capability to meet current and future threats by providing a credible force that is capable of deterring adversaries and participating in NATO operations. Romania will have no difficulty absorbing this equipment into its armed forces.
The proposed sale of this equipment and support will not alter the basic military balance in the region.
- General Dynamics Land Systems, Sterling Heights, MI; BAE Systems, York, PA;
- Leonardo DRS, Arlington, VA;
- Honeywell Aerospace, Phoenix, AZ;
- Raytheon Company, McKinney, TX;
- Lockheed Martin, Orlando, FL;
- L3 Harris, Melbourne, FL;
- American Apex Corporation, Delaware, OH;
- Allison Transmissions, Indianapolis, IN;
- Pearson Engineering, New Castle, United Kingdom;
- Amentum, Chantilly, VA;
- CAE, Chantilly, VA;
- Palomar, Carlsbad, CA;
- Boeing Company, Arlington, VA;
- Fibrotex, Stearns, KY; and
- US Ordnance, McCarran, NV.
- There are no known offset agreements proposed in connection with this potential sale.
Implementation of this proposed sale will require approximately (22) U.S. Government and (52) U.S. contractor representatives to travel to Romania for a duration of up to five years to support equipment fielding and training.
There will be no adverse impact on U.S. defense readiness as a result of this proposed sale.
The description and dollar value are for the highest estimated quantity and dollar value based on initial requirements. Actual dollar value will be lower depending on final requirements, budget authority, and signed sales agreement(s), if and when concluded.
View original News release
No comments:
Post a Comment