Friday, January 24, 2020

STREAMING VIDEO UPLOAD: Study Session Mesa City Council Thun23 Jan 2020

Jennifer Duff isn't the only councilmember that's confused at the start of this study session, after Vice-Mayor opens it with a grimace. 
At more than 2 hours long, this is a lengthy session with City Manager Chris Brady stepping in early to try to explain certain things. . . 
As you can tell by the screen-grab with Ass't City Manager Natalie Lewis caught in an awkward expression, she's not the only one around the tables in that mode ....and BTW:
THE CITY OF MESA HAS A NEW DIRECTOR OF HOUSING AND COMMUNITY DEVELOPMENT!! [no announcement from MesaNow about that surprise] 
Please Note: Agendas for City Council meetings were posted earlier on this blog. Item #s were changed, however if U got confused . . . 







__________________________________________________________
Published: Thu 23 Jan 2020
Views; 5 at time of upload to this blog
Running Time: 2:31:35

Planning & Zoning Board Meeting Wed 22 Jan 2020: Streaming Video Upload

Chairman is absent. They breeze through the Consent Agenda after making sure that blue comments are collected and the Consent Agenda is read before the voting takes place.
Item 3-b has been removed from the Consent Agenda
File #: PZ 20016   
Type: PZ Zoning - Action Status: Agenda Ready
In control: Planning and Zoning Board - Public Hearing
On agenda: 1/22/2020
Title: ZON19-00848  District 6. Within the 9300 through 9500 blocks East Cadence Parkway (north and east side). Located east of Ellsworth Road and south of Ray Road. (17± acres). Site Plan Review. This request will allow a multi-residential development within the Cadence at Gateway Community.  Shawn Byron, RVI Planning + Landscape Architecture, applicant; PPGN-Ellsworth, LLLP, owner. (Continued from January 8, 2020). Planner: Lesley Davis Staff Recommendation: Approval with conditions
Attachments: 1. Exhibit 1 - Vicinity Map, 2. Exhibit 2 - Staff Report, 3. Exhibit 3.1 - Project Narrative, 4. Exhibit 3.2 - Site Plan, 5. Exhibit 3.4 - Elevations, 6. Exhibit 4 - Citizen Participation Plan, 7. Exhibit 5 - Citizen Participation Report
_________________________________________________________________
DEVELOPMENT TEAM 
Developer: GTIS Partners  
Theodore Karatz  
1999 Avenue of the Stars, Suite 3350  
Los Angeles, CA 90067  (310) 432‐8210  tkaratz@gtispartners.com  
 
Planning/Landscape Architecture:  RVi Planning + Landscape Architecture  
Christopher G. Jones, PLA  
Shawn Byron, PLA  
120 South Ash Avenue  Tempe, AZ 85281  (480) 994‐0994  cjones@rviplanning.com  sbyron@rviplanning.com   

Architect:  Felten Group  
Randy Kunzelmann   
18325 North Allied Way Suite 200  
Phoenix, AZ 85054  (602) 867‐2500  Randy.Kunzelmann@Feltengroup.com   

Engineer:  Atwell  Darrell Smith, PE  
4700 E. Southern Avenue  
Mesa, AZ 85206   (480) 218‐8831   dsmith@atwell‐group.com   

Attorney:  Gammage & Burnham   
Susan Demmitt   
2 N. Central Ave., 15th Floor  Phoenix, AZ 85044  (602) 256‐4456  sdemmitt@gblaw.com 
________________________________________________________________

PLANNING DIVISION  
STAFF REPORT 

6 Pages
Planning and Zoning Board                                          
January 22, 2020
CASE No.: ZON19-00848                                   
PROJECT NAME: Cadence Multi-family 
Owner’s Name: PPGN-Ellsworth, LLLP
Applicant's Name: Shawn Byron, RVI Planning + Landscape Architecture


Location of Request:
Within the 9300 through 9500 blocks of East Cadence Parkway (north and east side). Located east of Ellsworth Road and south of Ray Road.  
Parcel No(s):  313-25-005


Request:  Site Plan Review.
This request will allow a multi-residential development within the Cadence at Gateway Community. Existing Zoning District: Planned Community (PC) Council District: 6
Site Size:17 ± acres 
Proposed Use(s): Multi-residential development Existing Use(s): Vacant
Hearing Date(s): January 22, 2020 / 4:00 p.m.
Staff Planner: Lesley Davis
Staff Recommendation: Approval with Conditions 


HISTORY
On October 15, 2007, the City Council approved an amendment to the General Plan to add Mixed-Use Community land use designation to the City’s community character types. 
The City also approved an amendment to the Zoning Ordinance to add a Planned Community (PC) zoning district to the City’s base zones. 
On September 22, 2008, the City Council approved a major General Plan amendment to change the land use designation on 1700 acres of property in the City that included the subject property. 

As part of the amendment, the subject property land use was changed from Mixed Use/Employment, Mixed Use/Residential, office, Community Commercial and Medium Density Residential 4-6 to a Mixed-Use Community designation. 
Although not yet annexed, the subject property was part of Mesa’s planning area.   PLANNING DIVISION  
STAFF REPORT


On September 10, 2012, the City Council approved annexation of the property into the City of Mesa with designation of a comparable zoning of Limited Commercial.

On the same date, the City Council also approved to rezone the property from Limited Commercial to a Planned Community District and established the Pacific Proving Grounds North Community Plan, which was subsequently named as the Cadence Community Plan.   
On June 12, 2019, the Planning and Zoning Board approved the Development Unit Plan for Development Unit 1, Phase 1 of the Planned Community District to guide development on the property. 


PROJECT DESCRIPTION
Background: The subject site is 17± acres of undeveloped property within the Cadence at Gateway Planned Community District.

The request is for a site plan approval to allow development of multiple residence use on the property.
The submitted site plan shows proposed development of 195- single-story detached units with overall density of 11.95 dwelling units per acre.
Per the approved PCD, multiple residence is allowed in the district through a site plan approval by the Planning and Zoning Board. Per section 3.8 of the Community Plan (CP), Site Plan Review is required for all non- single residence development projects within Cadence at Gateway.   
According to the applicant, the proposed development will be gated and designed in a  resort style and provide a transition between the traditional single-family development to the south and east of the property, as well as the proposed commercial and office development to the north and west of the property. 

Per the provided site plan, the primary access to the site will be from Cadence Parkway located on the western side of the property.  A secondary exit only access will also be provided along Cadence Parkway located at the southeastern section of the property.
According to the applicant and the provided site plan, although the project is proposed to be gated, there are pedestrian connections strategically placed to provide connectivity to the adjacent developments within the Cadence at Gateway community. 

General Plan Character Area Designation and Goals:
The property is located in a Mixed Use Community character area designation of the City’s General Plan. Per Chapter 7 of the General Plan, the primary focus of the Mixed Use character area designation is for large land areas where it is possible to develop a mixture of uses that create a complete and identifiable community.
Such mix of uses include employment, industrial, office, retail, medical, educational, community service, tourism, entertainment, open space, recreational, and residential uses to provide a complete community atmosphere. 
The subject request conforms to the goals of the Mixed Use community character area.
Specifically, the proposed use is to allow the development of higher density residential that provide diverse housing choice for residence and help create a complete and identifiable neighborhood that aligns with the goals of the General Plan for a Mixed Use Community.
The proposed housing units will also help increase the population of the area and aid in supporting current and proposed commercial uses in the Plan Community District area; as well as help to create a complete and identifiable neighborhood as envisaged in Chapter 4 of the General Plan.
This chapter of the plan encourages the creation and maintenance of a variety of great neighborhoods that also create a sense of place for people to live, work, and play.
The request also conforms to the criteria for review outlined in Chapter 15 (pg. 15-1&2) of the Mesa 2040 General Plan.   

Gateway Strategic Development Plan:
The property is also located within the Mixed Use Community District of the Gateway Strategic Development Plan. According to the plan, the focus of the Mixed Use Community District is to provide sustainability through the creation of a live/work/play community with a wide variety of land uses to include low to high density residential, commercial, employment, civic and recreational uses. The proposed request  for multi-residential development conforms to the goals of the Gateway Strategic Development plan by providing higher density residential development that will support the future planned commercial and office uses within the Community, as well a place for people to  live, work, and play.  
Zoning: This property is zoned a Planned Community (PC) with an approved Community Plan (CP).  The subject property is located within Phase 1 of the Development Unit 1 (DU 1) of the PC district.  Approval of the PC included Land Use Groups (LUG) and allowed uses.  The applicant has identified that the LUG they will be utilizing is the Community Multi-Residence (CMR). The subject request for multi residence uses are allowed use in the CMR LUG.  


Site Plan and General Site Development Standards:
As stated, the site plan shows the proposed development of a 195-unit detached higher density single-story residential on 17± acres. 
According to the applicant, the units will be available for rental and designed as a gated community with pedestrian connectivity to the surrounding uses. 
The site plan shows provision of covered parking spaces and garages located along the central drive aisle in the development. 
The residential units are also proposed to be constructed in small groupings of two to five units. With open spaces areas to support small community gatherings for residents.
The site plan also shows access to the site will be from Cadence Parkway located on the west side of the subject property (see exhibit 3.2) and a secondary exit only access on the southeastern side of the site. Section 13.3 of the approved community plan requires 410 parking spaces for the development. The proposed site plan shows 411 spaces, which is 2.1 parking spaces per unit. This conforms to the approved parking standards in the PCD.   
> Overall, there are three large amenity areas proposed to support the development. 

The amenities areas include a  primary  amenity located at the center of the development and consist of  a community building/leasing office, swimming pool area with outdoor kitchen and shaded seating areas, a  small dog run area, as well as  large lawn area with  variety of seating  and  a fire pit.  
The second amenity area will be located toward the southeaster portion of the development and includes two large rectangular activity lawn areas with lawn gaming, such as Bocce Ball, Cornhole or Croquet, and passive shaded seating areas. 
The third amenity area, as shown on the site plan, will be located at the northwestern edge of the development and consist of a large dog run area that includes terraced stadium type seating areas and a shaded plaza.  
As part of the proposed site plan, the applicant is also requesting a minor modification to the General Development Standards for the PCD.

The Community Plan (CP) for Cadence at Gateway identified a process for an applicant to propose minor modifications to the General Development Standards. 
Chapter 3 of the CP, specifically, Section 3.8(D) establishes the criteria to help determine a major vs. minor modification for a Site Plan within Cadence.
Once that determination has been made, Sections 3.9(a)(ii) of the CP allows minor modifications to General Development Standards to be considered and approved by the Zoning Administrator based on established criteria for proposed minor modifications.
In addition to the criteria established in the CP, Section 5.1 of the Development Unit Plan for Development Unit 1 Phase 1 identifies specific modifications to Section 7 of the CP that may be approved administratively by the Zoning Administrator, concurrent with Site Plan and Design Review.   
The applicant is proposing two modifications to the General Development Standards, which comply with the criteria established that allows the Zoning Administrator to consider as an Administrative Request. 

The proposed modifications affect the overall site plan, so they have been identified below. 
  • The first is a reduction to the minimum building separation from 25-feet to 10-feet between buildings on the same lot for single-residence rental bungalows, villas or cluster style residences. Staff has evaluated the request against the criteria and is supportive of the request.  The size and heights of the units are more indicative of single‐family residential which typically have 6-foot to 10‐foot building separations within Cadence. 
  • The second requested modification is to reduce the minimum setback from 15‐foot to 5-foot along Cadence Parkway. This request is due to a recorded landscape tract that is 24-foot wide along Cadence Parkway that was recorded as part of the roadway dedication.  The required setback of 15-foot, per the City standards, is measured from the property line, which would typically be from the right‐of‐way (ROW) of the Cadence Parkway.  The recorded landscape tract moves that property line and requires the applicant to measure their setback from the edge of the tract instead of the right-of-way.  Staff supports the setback reduction to 5-foot as it complies with the established criteria in Section 3.9(a)(ii) of the Community Plan and achieves a 29-foot setback, which exceeds the intended 15-foot landscape buffer from the street.  This meets the intent of the General Development Standards to provide an appropriate landscape buffer between the roadway and the multi-residence units.  
With the requested modifications, the proposed site plan is consistent with the requirements of the Community Plan and the DU (i.e. DU 1, Phase 1) and meets the review criteria outlined in Section 3.9(a) of the CP. (See condition #4.) 
Design Review: The Design Review Board is scheduled to review the request on January 14, 2019. Staff will provide an update of the Design Review Board meeting and comments at the scheduled study session on January 22, 2020. 
Surrounding Zoning Designations and Existing Use Activity: Northwest PCD Vacant North PCD (Eastmark) Vacant
Northeast PCD (Eastmark) Residential
West (Across Cadence Parkway) PCD
Subject Property PCD Residential
East PCD Residential
Vacant Southwest (Across Cadence Parkway) PCD Vacant
South PCD Residential
Southeast PCD Residential 
Compatibility with Surrounding Land Uses:
The site is located within the Cadence at Gateway Community and adjacent to existing single residence properties to the east and south.
There is a planned commercial development to the northwest of the site that also includes attached higher density single residences.
The higher density resident is proposed to be developed to the west (across Cadence Parkway) of the commercial development.
The approval of a single story multi-residential use on the subject property will provide a transition between the single residences and the proposed commercial development.  The proposed subject development, is consistent with the Community Plan and the DU Plan for DU 1, Phase 1 of the PC and consistent with the intended character of  the district and  surrounding land uses.  
Neighborhood Participation Plan and Public Comments Section 3.7(b)(iv) of the Cadence at Gateway Community Plan includes requirements for Citizen Participation procedures and standards.
The applicant submitted a Citizen Participation Plan that conforms to the requirements of the Community Plan. The Citizen Participation Plan included notifications as identified in the CP, which were to the master developer, Queen Creek Unified School District, all registered neighborhood associations within one-half mile of DU 1, Phase 2, all property owners within DU 1, as well as  all property owners within 750-feet of the boundary of DU 1. Additionally, the applicant sent e-mails to those parties on an e-mail contact list that was generated through the previous DU approval that they have included for their outreach. 
The applicant also held a neighborhood meeting for residents on Thursday, November 21, 2019.  Planning staff attended the meeting. 
Issues discussed at the meeting included concerns with traffic, multi-family uses, shared amenities and pedestrian access.
The applicant will provide an updated Citizen Participation Report to staff prior to the January 22, 2019 Study Session.  That report will include a summary of the meeting. 
As of writing this report, staff has received one email from a resident with questions relating to the pedestrian access gates on the eastern edge of the site.  The site plan showed to the residents at the neighborhood indicated construction of 3 pedestrian gates on the eastern edge of the property. 
At the neighborhood meeting, several residents expressed concerns with proximity of the gates to the existing homes.  Since the neighborhood meeting, the applicant has revised the site plan and reduced the number of access gates along the eastern side of the property. The site plan under consideration (see exhibit 3.2) shows only one gate on the east side that will exit out to an existing retention area.  Staff will provide the Board with an update of any new contact with concerned property owners during the scheduled Study Session on January 22, 2020.  
Staff Recommendations: 
The subject request is consistent with the criteria for approving a Site Plan outlined in section 3.9(a) of the Community Plan; the Development Unit Plan for Development Unit 1, Phase 1.; as well as
the approved Community Plan and vision.

The subject request is also compatible with the Mesa General Plan and the Phoenix-Mesa Gateway airport.
Therefore, staff is recommending approval of the site plan with the following conditions: 
Conditions of Approval;

1. Compliance with the final site plan submitted.
2. Compliance with Ordinance number 5115 and the adopted Pacific Proving Grounds North Community Plan.
3. Compliance with the Cadence at Gateway Development Unit 1 – Phase 1 Development Unit Plan dated June 4, 2019.
4. Prior to application for a building permit, apply for and receive Administrative approval from the Planning Director to:
a. Allow a 10-foot separation between buildings or comply with Community Plan requirements    for building separation.
b. Allow a 5-foot building setback along Cadence Parkway or comply with the Community Plan requirements for building setbacks.
5. Compliance with all City development codes and regulations. 6. Compliance with all requirements of Design Review.  

Exhibits:  
Exhibit 1- Vicinity Map 

Exhibit 2- Staff Report
Exhibit 3- Application Information 
3.1  Project Narrative  3.2  Site Plan 3.3  Landscape Plan 3.4  Elevations
Exhibit 4- Citizen Participation Plan
Exhibit 5- Citizen Participation Report  

________________________________________________________________________
Published on Jan 23
Views: 8
Running Time: 49:00

Huge rally as Iraqis demand US troops pull out - BBC News

Huge crowds 
have taken to the streets of Iraq's capital, Baghdad, to demand that US forces leave Iraq.
A Populist Politician Muqtada al Sadr joins a peaceful rally in Baghdad after asking an end to government corruption for years

Mnuchin Sees 20-Year Bond ‘Slightly’ Extending Treasury Maturity

Former Foreclosure King Mnuchin who was appointed by Trump to be Treasury Secretary is planning to introduce a 20-year bond . . . 

Here's How Democracy Works in Iraq > After Years of Corruption in The U.S.-Installed Government

The Iraqi Parliament voted one more time to ask that all foreign miitary troops and private security contractors leave the country. This is just one uploaded video of demonstrations that have gone on for years.

How Qasem Soleimani was Assassinated with MQ-9 REAPER Military Drone


1,234,158 views
Jan 9, 2020
Qasem Soleimani was an Iranian Military General who led a special guerrilla unit known as the Quds forces, He was one of the most powerful and feared military leaders in the whole of the middle east and Iran specifically. Due to his position, he had many enemies around the world and in the west specifically, Soleimani had survived several assassination attempts by Western, Israeli and Arab agencies over the past two decades. Previous US presidents before Donald Trump had tried to assassinate him but they feared that the consequences will be too big, so some tried to do it covertly, Last year Tehran said it foiled an assassination attempt by Israeli and Arab spies, who tried to buy a property next to a mosque built by Soleimani’s father in the city of Kerman so they could dig a tunnel and plant explosives to blow him up during a religious ceremony. For years, the U.S. military kept close tabs on the Iranian General Every day. Whom he met. What he planned.... The MQ-9 Reaper is one of the deadliest military drones in the world, it is an expensive piece of military hardware at $64 million, the MQ-9 is an unmanned aerial vehicle that came into service in 2007 retiring the previously used MQ-1 predator A. It is currently operated by Australia, France, America, Belgium, United Kingdom, India and a few other powerful nations. The Reaper is a remotely piloted weapons platform capable of instant action and engagement. It is equipped with some of the best military tech out there, The baseline system carries the Multi-Spectral Targeting System, which has a robust suite of visual sensors for targeting, The MTS-B integrates an infrared sensor, color/monochrome daylight TV camera, image-intensified TV camera, laser designator, and laser illuminator. Social Media: Instagram: https://www.instagram.com/tech_overwa... Twitter: https://twitter.com/Tech_OverWatch Facebook: https://www.facebook.com/Wetechsavvy/

Bridgewater Co-CIO Prince Calls the End of the Boom-Bust Cycle

2018 
Was it a A lesson learned??   Ya don't tigthten and ya don't __ease__
It's the end of the Boom-Bust Cycle?
[as we know it] 
 It may be . . . . 

GREGORY BOVINO: Nazi Cosplay Time in Mineeapolis...Trump's ICE Enforcer

  UPDATE ON SUNDAY 25 JANUARY 2026 Top stories Federal agents fatally shoot Alex Pretti in Minneapolis Star Tribune Fact check: Video, witne...